ACHIEVE A HIGHER LEVEL OF PRECISION IN MINING PLAN ESTIMATIONS
The need was identified among planning area users to obtain more accurate simulation results in order to align their short-term plans with actual conditions.
REDUCTION OF MINING ASSUMPTION PROCESSING TIMES
The time required to process mine assumptions using the conventional Excel format took 2 to 3 days to obtain the final result. Our multidisciplinary team worked to implement DataGrade, enabling users to achieve reliable results in a much shorter timeframe.
2D/3D WEB PLATFORM IMPLEMENTATION
Robust simulation models were developed to adjust operational changes, ensuring the reliability of results. Additionally, we implemented a 2D and 3D haulage visualization module. The deployed web application integrates data on topography, mining cuts, routes, equipment delays, as well as plant and maintenance information.